|
|
|
Jimmy Chenault gave up tracking PBR panels after several thousand miles. |
|
|
|
Trim department members Jesse Vasquez and George Coates custom fabricate a section of mansard flashing for a church project. |
|
|
|
Shop machinist and fitter Dave See pre-punches clips for a tapered rafter. |
|
|
|
Shipping / Loadout crew members Terry Love and Mike Atkins load a tractor/trailor rig to be shipped out of state. |
|
|
|
Dean Brock prepares a straight column for fabrication. |
|
|
|
|
Chad Hickenbottom welds clips to a large bypass column. |
|
|
|
|
Joey Lee Rodriquez prepares to weld a baseplate to a rigid framed column. |
|
|
|
|
Fitter / painter Felipe Corona primes a column in preparation for shipping. |
|
|
|
|
Felipe Elias Laguna assists with cable bracing for the shipping department. |
|
|
|
Machinist Ed Glenn prepares a rafter splice connection plate for punching. |
|
|
|
Lead fitter Art Barragan moves a set of columns to be welded. |
|
|
|
Amalio Ramon adjusts a tapered rafter for sub-arc welding. |
|
|
|
Fitter / welder Roy Timms hoists a outside flange plate to be sub-arc welded to a rafter web. |
|
|